Key Highlights
- Incident:A landslide caused a tunnel collapse in Sikkim, resulting in 10 fatalities and 25 individuals trapped.
- Location:The disaster occurred at the ADIT-3 tunnel of the NHPC's Teesta Stage-VI project.
- Rescue Efforts:Emergency teams are facing challenges due to toxic gas and adverse weather conditions.
NAMCHI, SIKKIM — A massive rescue operation is underway in the Samardung area of Jholungey following a violent landslide that triggered a structural collapse inside an under-construction hydroelectric project tunnel. The incident has left at least 10 workers dead and dozens more trapped deep underground.
The disaster occurred at the ADIT-3 tunnel, a critical segment of the National Hydroelectric Power Corporation’s (NHPC) Teesta Stage-VI Hydroelectric Project. On Monday afternoon, July 20, 2026, hazardous methane gas accumulated inside the subterranean passage, emanating from underground rock strata approximately 1.5 kilometers into the shaft.
An attempt to vent and release the trapped gas reportedly sparked a powerful explosion, destabilizing the surrounding terrain and unleashing a massive landslide that blocked the tunnel's entrance, effectively cutting off the escape route for those inside. While some workers managed to escape immediately following the initial blast, approximately 25 individuals—including NHPC personnel and contractors from Patel Engineering Ltd.—became stranded deep within the mountain.
Emergency responder teams from the National Disaster Response Force (NDRF), State Disaster Response Force (SDRF), Sikkim Police, and local Fire Services rushed to the scene. However, the rescue operation has faced severe setbacks. Initial rescue attempts by first responders had to be abandoned when several personnel experienced extreme dizziness and breathing difficulties due to low oxygen levels and lingering toxic methane.
Moreover, heavy, continuous rainfall across the Namchi district has triggered additional terrain instability, continuously threatening the safety of the active rescue lanes. To break the deadlock, specialized teams equipped with advanced gas-protective gear have been deployed from neighboring West Bengal to help navigate the narrow, toxic passageways.
By Tuesday morning, authorities confirmed that 10 bodies had been successfully recovered from the wreckage. Seven of the victims have been identified as laborers from various regions, including West Bengal, Uttarakhand, Punjab, Assam, and local areas of Namchi.
Sikkim Chief Minister Prem Singh Tamang-Golay is closely monitoring the situation and confirmed that all available state resources are being directed toward the site. "I am deeply saddened by the tragic incident at the under-construction tunnel... My heartfelt condolences go to the families of the workers who have lost their lives," the Chief Minister shared, adding that specialized agencies are working tirelessly to reach the remaining trapped personnel.
Prime Minister Narendra Modi also spoke with Chief Minister Tamang on Tuesday morning, expressing deep concern for the trapped victims and assuring full assistance and solidarity from the Central Government as rescue operations enter a critical phase.
The ongoing rescue efforts highlight the dangers associated with construction projects in challenging terrains, particularly those involving hazardous materials like methane gas. As the situation develops, authorities remain hopeful for the safe recovery of the trapped workers.
Published by Banx Network. This article is part of the Banx decentralized media programme, powered by the BXE token on the XRP Ledger.






